OM617

Instrukcja serwisowa silnika OM617 (Mercedes-Benz, oryginał po angielsku), odczytana ze skanów WIS. Rozdziały według grup instrukcji.

General, technical data

  1. Mercedes-Benz Service
  2. Instructions for use of service manual 00
  3. Engine and vehicle identification 00
  4. Vehicle identification number locations 00
  5. Technical data 00

Engine removal and installation, ventilation, crankcase

  1. Checking compression pressure
  2. Checking cylinders for leaks
  3. Evaluation of cylinder bores
  4. Measuring oil comsumption
  5. Removal and installation of engine (oil capacity)
  6. Engine breather — functional description
  7. Measuring, boring and honing cylinder bores
  8. Renewing, boring and honing cylinder liners
  9. Facing cylinder crankcase parting surface
  10. Knocking-out and inserting steel balls for main oil ducts
  11. Replacing core hole closing cover in cylinder crankcase
  12. Removal and installation of front cylinder crankcase cover
  13. Installation and centering of intermediate flange
  14. Removal and installation of complete oil pan
  15. Cylinder head bolts and tightening of cylinder head bolts
  16. Removal and installation of cylinder head
  17. Removal and installation of pre-chambers
  18. Facing cylinder head parting surface
  19. Pressure-testing cylinder head

Crankshaft assembly

  1. Checking, renewing and tightening connecting rod bolts
  2. Reconditioning and squaring connecting rod
  3. Removal and installation of pistons
  4. Checking and reconditioning of crankshaft
  5. Mounting of crankshaft
  6. Renewing front crankshaft radial sealing ring
  7. Renewing front crankshaft radial sealing ring (continued)
  8. Removal and installation of pulley, vibration damper and balancing disc
  9. Static balancing of balancing disc
  10. Checking and correcting adjustment of TDC transmitter
  11. Removal and installation of crankshaft sprocket
  12. Removal and installation of flywheel and driven plate
  13. Renewing ring gear of flywheel
  14. Statically balancing of flywheel
  15. Instructions for full balancing of engine

Engine timing, valve train

  1. Inspection and adjustment of valve clearance
  2. Inspection and adjustment of camshaft timing
  3. Removal and installation of camshaft
  4. Grinding camshaft bearing journals
  5. Removal and installation of rocker arms with rocker arm bearing brackets
  6. Renewal of rocker arms and rocker arm bearing brackets
  7. Removal and installation of valve springs
  8. Checking valve springs
  9. Replacement of valve stem seals
  10. Checking and machining valves
  11. Checking and renewing valve guides
  12. Machining valve seats
  13. Removal and installation of chain tensioner
  14. Renewing timing chain
  15. Removal and installation of tensioning rail
  16. Removal and installation of slide rails
  17. Removal and installation of intermediate e sprocket shaft
  18. Removal and installation of guide wheel

Diesel injection system

  1. Survey model — engine — injection pump
  2. Operation injection pump with governor
  3. Operation engine-transmission-overload protection
  4. Adjustment of idle speed and idle speed adjuster
  5. Checking maximum speed at no-load
  6. Checking injection timing (begin of delivery) with digital tester (RIV method)
  7. Checking injection timing (begin of delivery) (high pressure method)
  8. Checking injection timing (begin of delivery) (flow pressure method)
  9. Checking injection timing (begin of delivery) (position indicator RIV method)
  10. Adjusting injection timing (begin of delivery) with digital tester (RIV method)
  11. Adjusting injection timing (begin of delivery) (high pressure method)
  12. Adjusting injection timing (begin of delivery) (position indicator RIV method)
  13. Checking injection nozzles
  14. Disassembly, cleaning, assembly and adjustment of injection nozzles
  15. Venting Injection System
  16. Checking fuel pump and bypass valve
  17. Checking vacuum shutoff for leaks
  18. Removal and installation of injection pump
  19. Installation of injection pump (with locking screw)
  20. Replacement of pipe connection, delivery valve or copper sealing ring
  21. Replacement of vacuum control unit at injection pump
  22. Removal and installation of injection nozzles
  23. Removal and installation of fuel pump
  24. Removal and installation of injection timing device

Air intake, air cleaner, turbocharger

  1. Removal and Installation of Air Filter
  2. Checking boost pressure of turbocharger
  3. Removal and installation of exhaust gas turbocharger
  4. Functional description of exhaust gas turbocharger with aneroid compensator

Belt drive

  1. Instructions concerning renewal and tensioning of V-belts
  2. Renewing and tensioning of V-belt

Intake and exhaust manifold, emission control

  1. Vehicle identification
  2. Operation exhaust gas recirculation Gs
  3. Testing EGR
  4. Removal and installation of intake manifold, replacement of gasket
  5. Removal and installation of exhaust manifold

Electrical system engine

  1. Operation of preglow system
  2. Installing preglow time relay with modified ventilation
  3. Checking preglow system

Engine lubrication

  1. Oil circuit, oil pressure, pressure relief valve and oil filter
  2. Removal and installation of oil return flow line of exhaust gas turbocharger
  3. Removal and installation of oil spray nozzles
  4. Removal and installation of oil spray nozzles (continued)
  5. Checking thermostat in oil filter
  6. Checking thermostat in oil filter (continued)
  7. Removal and installation of oil pump
  8. Removal and installation of oil pressure relief valve

Engine cooling

  1. Coolant circuit and engine cooling
  2. Draining and filling-in of coolant — antifreeze table
  3. Cleaning cooling system
  4. Removal and installation of coolant thermostat
  5. Removal and installation of coolant pump
  6. Reconditioning of coolant pump
  7. Reconditioning of coolant pump (continued)
  8. Removal and installation of coolant pump housing
  9. Removal and installation of coolant pump housing (continued)
  10. Removal and installation of radiator
  11. Reconditioning of radiator
  12. Checking of expansion tank closing cover
  13. —Iilusti

Engine suspension

  1. Removal and installation of front engine mounts
  2. Removal and installation of rear engine mount
  3. Adjusting engine stop — Model 123.193
  4. Removal and installation of engine shock absorber

Throttle control

  1. Adjusting throttle linkage
  2. Removal and installation of engine longitudinal regulating shaft
  3. Removal, installation and adjustment of front wall regulating shaft
  4. Removal and installation of accelerator pedal

Fuel system

  1. Removal and installation of fuel tank
  2. Removal and installation of fuel expansion tank
  3. Removal and installation of ir immersion tube indicator
  4. Operation of immersion tube indicator for fuel gauge
  5. Operation fuel tank positive and negative venting system

Exhaust system

  1. Removal and installation of exhaust system