Removal and installation of intermediate e sprocket shaft

WIS 05-412

Tightening torques Nuts for cylinder head cover 15

Necked-down screw for camshaft sprocket 80 Fastening screw v for injection timer 40

Coupling nuts for injection lines 25

Closing plug for chain tensioner 90

Socket 27 mm, 1/2’ square, for rotating engine 17004-6799, – 001 589 65 09 00

1/2″ Box wrench socket, open, 17 mm, fo, inaction 1 sau, or injection lines 11004-6359 – 000 589 68 03 00

Impact puller for bearing bolt (basic unit} – 116 589 20 33 00

Threaded bolt M 6, 50 mm long cally 116 589 01 34.00 I wy for impact puller 11004-6366

Articulated wrench ae – 000 589 21 07 22

i 11004-6376 Overflow pipe Holding plate – 616 589 02 40 00

98 99100 101 102 105 – 636 589 02 23 00

Note

Removal and installation of intermediate e sprocket shaft – rysunek

The injection timer is mounted on intermediate sprocket shaft with a screw M 10 x 45 (95).

On engine 617.950 with double diaphragm vacuum pump, the screw has a hollow shaft.

The vacuum pump is provided with the required oil through this hollow screw.

Layout of double diaphragm vacuum pump

94 Chain locking screw 101 Lock washer

95 Screw M 10 x 45 102 Bearing bushing front

97 Washer 103 Woodruff key

98 Injection timer 104 Intermediate sprocket shaft

99 Screw M6 x 12 105 Bearing bushing rear 100 Snap ring B6 109 Bearing bushing injection timer

Removal and installation of intermediate e sprocket shaft – rysunek

On engines with piston vacuum pump, screw (95) is not hollow.

Do not mix up screws (95).

Layout with piston vacuum pump

Locking screw 101 Lock washer 94 95 Screw M 10 x 45 102 Bearing bushing front Washer 103 Woodruff key 97 Intermediate sprocket shaft 98 Injection timer 104 99 Screw M6 x 12 105 Bearing bushing rear Snap ringB6 109 Bearing bushing 100

Removal and installation of intermediate e sprocket shaft – rysunek
Removal and installation of intermediate e sprocket shaft – rysunek

On engine 617.950 since August 1978, and on engines 617.951/952 since start of series, the intermediate sprocket shaft (B) and the rear bearing bushing (B) of engines 615, 616 and 617.912 are installed for reasons of standardization.

These parts can also be installed on engines 617.950 manufactured at an earlier date.

Removal and installation of intermediate e sprocket shaft – rysunek
Removal and installation of intermediate e sprocket shaft – rysunek

A Intermediate sprocket shaft 1st version B_ Intermediate sprocket shaft 2nd version 8454

A. Rear bearing bushing 1st version B_ Rear bearing bushing 2nd version

412/2 F2 05.8—

Removal

1 Remove fan and radiator shell.

2 Remove vacuum pump (42-610).

3 Remove injection timer (07.1—210).

4 Remove injection pump (07.1—180).

5 Pull out intermediate sprocket shaft toward the rear.

Installation

6 Insert intermediate sprocket shaft from the rear.

7 Install injection timer (07.1—210).

8 Install injection pump (07.1180).

9 Check timing of camshaft (05-215) and begin of delivery (injection timing) of injection pump (07.1—110).

10 Install vacuum pump (42—610).

11 Install fan and radiator shell.

Removal and installation of intermediate e sprocket shaft – rysunek
Removal and installation of intermediate e sprocket shaft – rysunek

Intermediate sprocket shaft and injection timer

95 Screw M 10 x 45 101 Lock washer

97 Washer 102 Bearing bushing front

98 Injection timer 103 Woodruff key

99 Screw M6 x 12 104 Intermediate sprocket shaft 100 Snap ring B6 105 Bearing bushing rear