Adjusting injection timing (begin of delivery) with digital tester (RIV method)

WIS 07.1-114

Job no. of flat rates or standard texts and flat rates data 0O7–8300.

Testing and adjusting value

Rl-adjusting value (indirect injection timing) —15° after TDC

Tightening torque Nm

Closing plug on regulator (measuring point) 30–35

Special tool

Adjusting device Kays – 617 589 07 21 00

Note

Adjusting injection timing (begin of delivery) with digital tester (RIV method) – rysunek

Prior to adjustment, check ignition timing (07.1–108).

Adjusting

Adjusting injection timing (begin of delivery) with digital tester (RIV method) – rysunek

1 Mount holding bracket (01) on injection pump housing.

2 Place adjusting device (02) on cylinder head screws and holding fork (arrows).

Adjusting injection timing (begin of delivery) with digital tester (RIV method) – rysunek

3 Loosen nuts on injection pump flange as well as screws (3) on supporting bracket (4).

3 Screw 4 Supporting bracket

Adjusting injection timing (begin of delivery) with digital tester (RIV method) – rysunek

4 Adjust begin of delivery at idle speed by turning hex. head screw (arrow).

Ri-value: —15° after TDC.

Swivelling direction of injection pump

Toward engine = delivery begins earlier Away from engine = delivery begins later

5 Tighten nuts and screw for injection pump. Check preset value.

Adjusting injection timing (begin of delivery) with digital tester (RIV method) – rysunek

6 Stop engine.

7 Disconnect tester and RI-transmitter. Screw in closing plug (2) and tighten to 30—35 Nm.

8 Run engine and check for leaks.

9 Check oil level and correct, if required.