Adjusting injection timing (begin of delivery) (position indicator RIV method)
WIS 07.1-116
Job no. of flat rates or standard texts and flat rates data 07–8300.
Testing and adjusting value
—15° (after TDC) Rl-adjusting value (indirect injection timing)
Tightening torque
Closing plug on regulator (measuring point) 30–35 Position indicator – 617 589 08 21 00
Note
Check begin of delivery prior to adjustment (07.1–111).
Adjusting
Mount holding bracket (01) on injection pump 1 housing.
2 Place adjusting device (02) on cylinder head screws and holding fork (arrows).
3 Rotat crankshaft once in direction of rotation and set to —15° after TDC.
4 Loosen nuts on injection pump flange as well as screws (3) on supporting bracket (4).
3 Screw 4 Supporting bracket
5 Adjust begin of delivery by turning hex. head screw (arrow) (—15° after TDC).
Swivelling direction of injection pump
Toward engine = advances begin of delivery Away from engine = retards begin of delivery
6 Tighten nuts and screw for injection pump and check preset value.
7 Run engine and check for leaks.
8 Check oil level and correct, if required.





