Adjusting injection timing (begin of delivery) (position indicator RIV method)

WIS 07.1-116

Job no. of flat rates or standard texts and flat rates data 07–8300.

Testing and adjusting value

—15° (after TDC) Rl-adjusting value (indirect injection timing)

Tightening torque

Closing plug on regulator (measuring point) 30–35 Position indicator – 617 589 08 21 00

Note

Adjusting injection timing (begin of delivery) (position indicator RIV method) – rysunek

Check begin of delivery prior to adjustment (07.1–111).

Adjusting

Mount holding bracket (01) on injection pump 1 housing.

Adjusting injection timing (begin of delivery) (position indicator RIV method) – rysunek

2 Place adjusting device (02) on cylinder head screws and holding fork (arrows).

Adjusting injection timing (begin of delivery) (position indicator RIV method) – rysunek

3 Rotat crankshaft once in direction of rotation and set to —15° after TDC.

Adjusting injection timing (begin of delivery) (position indicator RIV method) – rysunek

4 Loosen nuts on injection pump flange as well as screws (3) on supporting bracket (4).

3 Screw 4 Supporting bracket

Adjusting injection timing (begin of delivery) (position indicator RIV method) – rysunek

5 Adjust begin of delivery by turning hex. head screw (arrow) (—15° after TDC).

Swivelling direction of injection pump

Toward engine = advances begin of delivery Away from engine = retards begin of delivery

6 Tighten nuts and screw for injection pump and check preset value.

Adjusting injection timing (begin of delivery) (position indicator RIV method) – rysunek

7 Run engine and check for leaks.

8 Check oil level and correct, if required.