Diesel injection system
- Installation survey
- Survey of injection pumps, injection nozzles
- Vacuum diagrams
- Testing, adjusting engine
- Testing engine output at exhaust emissions on the roller
- Testing and adjusting vacuum control valve for automatic
- Testing anti-jerk control (ARA)
- Testi vacuum cutoff for leaks
- 07.1–1 1843 Testing vacuum pump
- Removing and installing ELR actuator
- Removing and installing ARA actuator
- Re ‘ing ancl installing coolant temperature sensor
- Testing electronic idle speed control (ELR)
- Testing pneumatic idle ‘speed increase (PLA)
- Testing, adjusting idle speed
- Operation no. of operation texts and work units or standard texts
- Testing fuel pump (delivery)
- Testing fuel pressure (after testing delivery)
- Operation no. of operation texts and work units or standard texts
- Testing injection nozzles
- Servicing, adjusting injection nozzles
- Removing and installing injection nozzles
- Removing and installing inje ction timing device
- Servicing injection timing device
- Operation no. of operation texts and work units or standard texts
- Adjusting start of delivery with digital tester (RIV method)
- Adjusting microswitch at injection pump
- Removing and installing injection pump
- Removing and installing vacuum unit ( stop)
- Operation no. of operation texts and work units or standard texts
- Removing and installing microswitch at injection pump
- Operation no. of operation texts and work units or standard texts