Adjusting start of delivery with digital tester (RIV method)
WIS 07.1-8300
after testing
Preceding work: Operation no. of operation texts and work units or standard texts Testing start of delivery (07.1-8244). and flat rates: 07.1-8300
Connection diagram of digital tester without adapter (with adapter, see 07.1-8244)
Securing bolts (arrows) on injection purnp flange and on supporting bracket ………… slacken. Engine ……….. see ee eee eee ee run at idle speed. Ril value (indirect start of delivery) ……….. adjust by turning the adjusting device (30/1). RI specification: 14° + 0.5° ATDC.
Direction of rotation of adjusting screw
(30/1) To right = start of delivery retarded To left = start of delivery advanced
ohn = RA 07.1.1621-8300/1
Note lf the adjustment facility is insufficient, the injection purnp must be turned over. See removing and installing injection pump (07.1-8410).
switch off. Securing bolts (arrows) at injection pump flange and at supporting bracket ………….00.. tighten. Tightening torque 20–25 Nm. disconnect. Screw plug (arrow) at governor (10/6) ……… screw in. Tightening torque 30–35 Nm. Leak test with engine running perform. Engine oil level check, adjust to correct level if necessary.
Special tools
RA 07.1.1621-8300/2