Operation no. of operation texts and work units or standard texts

WIS 07.1-8627

Operation no. of operation texts and work units or standard texts – rysunek

Engine 605.911

Air cleaner cross pipe remove, install (09-8031).

Engine 606.910

Variable resonance intake manifold remove, install (14-1961).

All models

unscrew, screw on. Special tool Injection lines at injection pump 000 589 77 03 00, Tightening torque 10–20 Nm as reference value.

Note In order to avoid pipe fractures, the retaining clips must be positioned as shown in the overview figure in 07.1-9290 Removing and installing, replacing injection pressure lines.

When removing an injection pipe, it is necessary to replace the complete retaining clips of the relevant pipe.

ottage = RA, P1RBO7.99.1699-8627/1

Delivery valve holder (16) ……… dese eens remove, install. Special tool 617 589 01 09 00.

Installation note

To ensure that the seals of the delivery valve holders are correctly located, tighten the delivery valve holder to 30 Nm and slacken, once again tighten to 30 Nm and slacken, and tighten finally to 30 +5 Nm. Cornpression spring (16/1) 2.6.0… 0. eee ee oe check, replace if necessary. Copper seal (16/2) ……… se eee ee replace. Delivery valve (16/3) 2.0… ee ee eee rinse in diesel fuel before installing. Delivery valve carrier (16/4) 2.2.0.6… ee eee pay attention to installation position. O-ring (16/5) oc. ee ee eee ee see ee eens check, replace if necessary. Oil before installing. Leaktightness of all connection points ……… check with engine running.

Note The fuel system is bled automatically when starting.

Operation no. of operation texts and work units or standard texts – rysunek
Operation no. of operation texts and work units or standard texts – rysunek

Special tools

asthe = RA 07.1.1621-8627/2