Injection system,  OM617

Adjusting injection timing (begin of delivery) with digital tester (RIV method) following checkup

 

 

07.1-114 Adjusting injection timing (begin of delivery) with digital tester (RIV method) following checkup

 

Job no. of flat rates or standard texts and flat rates data 07—8300.

 

Testing and adjusting value
Rl-adjusting value (indirect injection timing)
Tightening torque
Closing plug on regulator (measuring point)
Special tool
Adjusting device
om617 - 0255-1.jpg
-15° after TDC
Nm 30-35
617 589 07 21 00

 

Note

 

Prior to adjustment, check ignition timing (07.1 — 108).

 

Adjusting
om617 - 0255-2.jpg
1 Mount holding bracket (01) on injection pump housing.

 

2 Place adjusting device (02) on cylinder head screws and holding fork (arrows).
om617 - 0255-3.jpg

 

07.1.8-114/1 F3

 

 

 

3 Loosen nuts on injection pump flange as well as screws (3) on supporting bracket (4).
om617 - 0256-1.jpg
3    Screw
4    Supporting bracket

 

4 Adjust begin of delivery at idle speed by turning hex. head screw (arrow).
Rl-value: -15° after TDC.
om617 - 0256-2.jpg
Swivelling direction of injection pump
Toward engine = delivery begins earlier Away from engine = delivery begins later
5   Tighten nuts and screw for injection pump. Check preset value.
6   Stop engine.
7   Disconnect tester and Rl-transmitter. Screw in closing plug (2) and tighten to 30—35 Nm.
8   Run engine and check for leaks.
9   Check oil level and correct, if required.
om617 - 0256-3.jpg

 

07.1.8-114/2 F 3