Adjusting injection timing (begin of delivery) (position indicator RIV method) following checkup
|
|||||
07.1—116 Adjusting injection timing (begin of delivery) (position indicator RIV method) following checkup
|
|||||
|
|||||
Job no. of flat rates or standard texts and flat rates data 07—8300.
|
|||||
|
|||||
|
|
||||
|
|||||
Note
|
|||||
|
|||||
Check begin of delivery prior to adjustment (07.1 — 111).
|
|||||
|
|||||
Adjusting
|
|||||
1 Mount holding bracket (01) on injection pump housing.
|
|||||
|
|||||
2 Place adjusting device (02) on cylinder head screws and holding fork (arrows).
|
|||||
|
|||||
07.1.8-116/1 F3
|
|||||
|
|||||
|
|||
3 Rotat crankshaft once in direction of rotation and \v
set to -15° after TDC.
|
|||
|
|||
4 Loosen nuts on injection pump flange as well as screws (3) on supporting bracket (4).
|
|||
3 Screw
4 Supporting bracket
|
|||
|
|||
5 Adjust begin of delivery by turning hex. head screw (arrow) (-15° after TDC).
Swivelling direction of injection pump
Toward engine = advances begin of delivery Away from engine = retards begin of delivery
6 Tighten nuts and screw for injection pump and check preset value.
|
|||
|
|||
7 Run engine and check for leaks.
8 Check oil level and correct, if required.
|
|||
|
|||
07.1.8-116/2 F3
|
|||
|
|||