Injection system,  OM617

Adjusting injection timing (begin of delivery) (position indicator RIV method) following checkup

 

 

07.1—116 Adjusting injection timing (begin of delivery) (position indicator RIV method) following checkup

 

Job no. of flat rates or standard texts and flat rates data 07—8300.

 

 

om617 - 0261-1.jpg

 

 

Note

 

Check begin of delivery prior to adjustment (07.1 — 111).

 

Adjusting
om617 - 0261-2.jpg
1 Mount holding bracket (01) on injection pump housing.

 

2 Place adjusting device (02) on cylinder head screws and holding fork (arrows).
om617 - 0261-3.jpg

 

07.1.8-116/1 F3

 

 

 

3 Rotat crankshaft once in direction of rotation and             \v
set to -15° after TDC.
om617 - 0262-1.jpg

 

4 Loosen nuts on injection pump flange as well as screws (3) on supporting bracket (4).
om617 - 0262-2.jpg
3    Screw
4    Supporting bracket

 

5 Adjust begin of delivery by turning hex. head screw (arrow) (-15° after TDC).
Swivelling direction of injection pump
Toward engine = advances begin of delivery Away from engine = retards begin of delivery
6 Tighten nuts and screw for injection pump and check preset value.
om617 - 0262-3.jpg

 

7   Run engine and check for leaks.
8   Check oil level and correct, if required.
om617 - 0262-4.jpg

 

07.1.8-116/2 F3