Air intake, M110 Removal and installation of intake pipeRemoval and installation of intake pipe 09—415 Removal and installation of intake pipe Removal 1 Partially drain coolant. 2 Remove air filter. 3 Remove carburetor (07.2-194). 4 Disconnect engine longitudinal regulating shaft and regulating rods. 5 Loosen all connections on intake pipe. 6 Loosen intake pipe fastening nuts or screws and remove intake pipe. Installation Install intake pipe in vice versa sequence as follows: 7 Install new intake pipe flange gasket. 8 Add coolant and check cooling system for leaks. 9 Adjust idle speed, while checking intake system for leaks (07.2-100). 09.2 ib-415/1 Poprzedni Removal and installation of air filter Nowsze Instructions for renewing and tensioning V-belts