Removal and installation of chain tensioner

WIS 05-310

Tightening torques Nm

Screws for chain tensioner on cylinder head25
Coupling nut for chain tensioner90

Note

Removal and installation of chain tensioner – rysunek
Removal and installation of chain tensioner – rysunek

The hydraulic chain tensioner is supplied with hydraulic oil by the way of an oil duct (4) in the cylinder crankcase front and in the cylinder head (arrows).

The contact pressure of the thrust bolt (10) against the tensioning rail is held constant by the check valve (4 and 5) and the pressure limiting valve (6 and 8) together with the compression spring (11), regardless of engine oi! pressure.

Venting takes place after the oil pressure in the engine oil circuit has been established and the chain tensioner is being filled up with oil.

Removal and installation of chain tensioner – rysunek

1 Closing nut 8 Ball 5 mm dia.

2 Aluminum sealing ring A 25 x 30 9 Compression

3 Ball seat ring spring

4 Ball 5 mmdia. 10 Thrust pin

5 Ball cage 11. Compression

6 Valve disk spring

7 O-ring 12 Housing 13 Circlip B 16

Caution! As of June 1980, the chain tensioner has been provided with a reinforced flange of 17 mm (previously 12 mm).

Removal and installation of chain tensioner – rysunek

Mount chain tensioner with 17 mm flange by means of screws M 8 x 30 mm (previously M 8 x 25 mm).

The chain tensioner housing and the closing nut dimensions were changed. The reason for this were cracked and leaking closing nuts.

Chain tensioner housing: dimension 1.2-°2 was 1.5mm

+0.2 Closing nut: dimension 15.5 was 14.5 mm

The part No. of the chain tensioner has not been changed.

Removal and installation

1 Remove fastening screws and remove chain tensioner.

2 Mount chain tensioner with a new gasket and tighten screws uniformly.

The pressure pin of the chain tensioner should rest against the tension rail lug.

Note: In the event of repairs, replace complete chain tensioner.