Testing contact (breaker) controlled transistorized ignition
WIS 07.5-520
Conventional tools
1 voltmeter; measuring range O—3 V, O—15 V with 0.1 V scale graduation
1 ohmmeter, measuring range starting 0.1 ohm
1. Testing series resistances
Loosen line connection on one connection of resistance to be tested.
Measure resistance with ohmmeter.
Series resistance Resistance nominal value at + 20°C
0.4 ohm 0.4 + 0.05 ohm 0.6 ohm 0.6 + 0.05 ohm
For warmer series resistances, the measured values are slightly higher.
2. Testing ignition coil
Insulation test
Separate ignition coil by removing terminals 1, 15, 4 from vehicle supply system.
Connect engine tester to ignition coil. Test according to operating instructions.
Whenever possible, test ignition coil with a suitable engine tester (e.g. SUN 745 or 1130) under operating conditions. The discovered faults are above all insulation damage, grounding and interturn shorts.
Evaluate voltage flow on scope according to subsequent illustration.
20-
Display Line-up Fault Voltage below 20 kV, less than 8 voltage peaks Cause Interturn interruption, interturn short or insulation damage against ground Remedy Renew ignition coil
Display evaluation
The ignition is perfect when the first oscillation attains 20 kV and at least 8 voltage peaks will follow. If this value is not attained, replace ignition coil.
Resistance test
| Resistance nominal value at + 20°C | |
| Primary winding measured between terminal 1 and 15 | 0.38–0.45 ohm |
| Secondary winding measured between terminal 1 and 4 | 8–11 kQ |
Measurements will be slightly higher when ignition coil is warmer.
3. Testing contact breaker point
For perfect function of transistorized systems the transfer resistance on contact breaker point should not be too high. To check, measure voltage drop on closed contact breaker point.
Connect voltmeter: + to cable connector (= terminal 7 or TD on switchgear) — to ground
Voltage indication max 0.3 volt.
If this value is exceeded, install a new contact breaker.
4. Testing switchgear and line connections
Check whether switchgear is connected to voltage or whether, if pertinently contacted, the switching transistor will lock the primary current of the ignition coil or let it pass. The primary current is not directly measured but, for the sake of simplicity, the voltage drop caused by this current.
Test with engine stopped and ignition switched on.
Test voltage drop at input of 0.4 ohm resistance with
contact braker point closed.
Connect voltmeter: + to input series resistance 0.4 ohm — to ground
The voltage drop may amount to max 0.4 volt.
When voltage drop is too high, check cable and cable connections.
4.1 Ge switchgear
Check connections on series resistances, on cable connector and on ignition coil for perfect condition.
Voltage with breaker point opened
This will check the locking conduct of transistor.
Connect voltmeter: + to terminal 15 ignition coil — to ground
No voltage should be available at terminal 15 ignition coil, i.e. readout = 0 volt.
If readout is not O volt, the transistor in switchgear is no longer locking. Replace switchgear.
Voltage with breaker point closed
Voltmeter connected as before.
Voltage at terminal 15 ignition coil = 2.6–3.5 volts.
If not, transistor is no longer switching through. Replace switchgear.
With breaker point closed or opened, the voltage measured at terminal 1 of ignition coil amounts to 0 volt.
If these values are above or below 0 volt, test series resistances, ignition coil and cables.
4.2 Ge or Si switchgear — wheel house unit —
in model 107
Designation of 4-core connecting line on switchgear
brown. …. ground black…… terminal 16 to series resistance 0.6 ohm
red/black . . . terminal 15 to series resistance 0.4 ohm
green/yellow . terminal 7 to cable connector ter-
minal 1 — ignition
distributor
Check connections on series resistances, on cable connector and on ignition coil for perfect condition.
Voltages with breaker points opened
This will check the locking conduct of transistor.
Connect voltmeter: + to terminal 15 ignition coil — to ground
There should be no voltage at terminal 15 ignition coil, i.e. readout = 0 volt.
If readout is not 0 volt, the transistor in switchgear is no longer locking. Replace switchgear.
Voltage with breaker point closed
Voltmeter connected as before.
Voltage on terminal 15 ignition coil = 2.6–3.5 volts.
if not, the transistor in switchgear is no longer switching through. Replace switchgear.
Voltage on terminal 1 of ignition coil with breaker point closed or opened amounts to 0 volt.
\f these values are below or above specifications, check series resistances, ignition coil and cables.
4.3 Si switchgear
Checking line connections
Check connections on series resistances, on cable connector and on ignition coil for perfect condition. With the ignition switched on, the pulled off 3-pole plug of switchgear plug connection should be connected to battery voltage at terminals 15 and 16.
Connect voltmeter: + to terminal 15 or 16 — to ground
Voltage with breaker point opened
This will check the locking conduct of the transistor.
Connect voltmeter: + to terminal 15 ignition coil — to ground
Terminal 15 ignition coil should carry battery voltage. If not, transistors in switchgear are no longer locking. Replace switchgear.
Voltages with breaker point closed
Voltmeter connected as before.
Voltage on terminal 15 ignition coil = 8.2–9.6 volts.
With breaker point closed, voltage on terminal 1 of ignition coil is 4.8–6.3 volts; with breaker point opened, battery voltage.
If not, transistors are no longer switching through. Replace switchgear.
4.4 Standard switchgear (Si)
Inspection of line connections
Pull 4-pole connecting plug from switchgear and test with voltmeter for battery voltage at 4-point round plug terminal 15 and terminal 16 with ignition switched on.
Connect voltmeter: + 1x to terminal 15 and 1 x to terminal 16
— to ground
\f there is no voltage, test all connections from input 0.4 ohm resistance to switchgear.
Then put back 4-point round plug on switchgear.
Voltage with breaker point opened
This will check the locking conduct of the transistor.
Connect voltmeter: + to terminal 1 ignition coil
— to ground
Terminal 1 should carry battery voltage.
If not, replace switchgear.
Voltage with breaker point closed
Voltmeter connected as before.
Voltage on terminal 1 ignition coil = 0.7–1.5 volts.
With breaker point closed, 3.6–4.6 volts are measured on terminal 15 of ignition coil; with breaker point opened, battery voltage.
If not, replace switchgear.
Values for testing switchgear
Measuring points and associated voltages for transistorized (TSZ) systems
Voltmeter Voltages outside nominal range: voltages Si standard causes, remedies Si-TSZ TSZ Plus to Minus to
| battery voltage | With correct battery voltage: Excessive voltage drop battery ohm series resistance caused resistances (corrosion), line etc. | |
| battery voltage | With correct voltage at 0.4 resistance: parallel resistance interruption between 0.4 ohm resistance input and terminal terminal 16 | |
| Higher voltage: transfer resistance breaker point too high. Renew breaker point. | ||
| 8.2-96V | 3.6-46V | With correct voltage at switchgear terminal 7 or TD: |
| battery voltage | Switchgear defective | |
| 4.8–6.3V battery voltage | 0.7–1.5V | Renew switchgear |
Layout of individual components
Model 108.057/058, 109.056, 111.026/027
2 Series resistance 0.4 ohm 4 Series resistance 0.6 ohm 5 Ignition coil
3 Switchgear 5 Ignition coil 7 Cable connector
Model 107
1. Ignition coil 2 Series resistance 0.6 ohm 3 Series resistance 0.4 ohm 4 Cable connector 5 Line from switchgear
Model 108.067/068 , 109.057
1 Switchgear 2 Cable connector
1. Ignition coil 2 Series resistance 0.4 ohm 3 Series resistance 0.6 ohm
Switchgear layout model 107