Removal and installation of slide rails
WIS 05-340
Tightening torques Nm
Nuts for cylinder head cover 15 Necked-down screw for camshaft sprocket i —_ 80 Fastening screw intermediate sprocket 25
Special tools
Impact puller for slide rail bearing bolt (basic unit) – 116 589 20 33 00
Threaded bolt M 6 for impact puller, 50 mm long =p – 116 589 01 34 00
Threaded bolt M 6 for impact puller, 150 mm long = – 116 589 02 34 00
Socket 27 mm, 1/2’ square A for rotating engine brvvareey – 001 589 65 09 00
Removing slide rails (89 and 89a)
1 Remove cylinder head cover. For this purpose, on 1G): Cs) and Gs) starting 1977, push out clamp assembly of fuel hoses on holder and pull down fuel hoses with clamp assembly in forward direction over cylinder head cover.
2 On model 123, remove radiator if required for reasons of space.
3 On Gs 1973-1975, remove vacuum pump.
4 Knock out slide rail bearing bolt with impact puller.
5 Remove slide rail in upward direction.
Installation
6 Coat bearing bolt on collar with sealing compound.
7 Position slide rail and knock-in bearing bolt with impact puller.
For this purpose, apply counterhold to slide rail with a screw driver.
28 Crankshaft sprocket 53 Camshaft sprocket 85 Tensioning rail 89 Outer slide rail 89a _ Inner slide rail 93 Slide rail 94 Chain locking screw 98 Intermediate sprocket a Chain tensioner 5974/1
Attention!
On plastic slide rails, the locating lug of slide rail must be seated in locating groove on lower or upper bearing bolt.
Since the plastic slide rail (89a) is also installed on other engines, the upper bearing bolt bore is designed as a double bore. When installing the upper bearing bolt, make sure that the bearing bolt is seated in the correct bore.
8 Mount cylinder head cover.
ETSI
Removing stide rail (93)
1 Remove intermediate sprocket shaft (05—412).
2 On vehicles model 123 with power steering, remove aluminum carrier of power steering pump (arrow).
Note: Not applicable on @us), (J), CS) and starting 1977.
3 > Knock-out bottom bearing bolt (91) with impact puller.
4 Unscrew upper bearing bolt (92).
5 Remove slide rail in upward direction through opening for intermediate sprocket.
Installation
6 Coat lower bearing bolt on collar with sealing compound.
7 Position slide rail and knock-in bottom bearing bolt with impact puller, while applying counterhold to slide rail by means of a screw driver.
Attention! With plastic slide rail, the locating lug of the slide rail should be seated in locating groove on bottom bearing bolt.
8 Position upper bearing bo!t and screw-in.
Note: Since the plastic slide rail is also installed on other engines, the upper bearing bolt bore is designed as a double bore. When inserting upper bearing bolt, make sure that the bearing bolt is seated in the correct bore.
9 For further installation proceed vice versa to the sequence of removal.
10 Check firing point (07.5—510).
Timing chain, tensioning and slide rails
@ 80 89
81@
83
84
50 Necked-down screw M 14 x 1.5 x 40 87 Connecting link
51 Circlip B 14 88 Timing chain
52 Compensating washer 89 Outer slide rail
53 Camshaft sprocket 89a _ Inner slide rail
80 Nut 90 4 bearing bolts 81 2nutsM8 91 Bearing bolt
83 Chain tensioner housing 92 Closing plug with bearing bolt
84 Gasket 92a Sealing ring 84a O-ring 93 Slide rail 84b O-ring 94 Chain locking screw
85 Tensioning rail 94a Sealing ring A 12 x 17 85a Bearing bolt 98 Intermediate sprocket