Installation and centering of intermediate flange
WIS 01-220
Data
Vertical runout of intermediate flange max. 0.10
Nm (kpm)
Tightening torques
Fastening screws for intermediate flange
50 (5)
Special tool
a a Dial gauge holder (2 each required) – 363 589 02 21 00
Socket 27 mm, 1/2″ square camp for turning the engine – 001 589 65 09 00
Self-made tool
Threaded bolt refer to fig. item 3
Note A new intermediate flange must be centered.
For reasons of standardization with engine 110 in model 126, intermediate flanges with two additional bores (arrows) have been installed. The bores are intended for transmissions with centering of set pins.
It is possible to mount these intermediate flanges on the previous engines as well.
Previous version
Start of series: February 1980
Model Engine Engine end No. Chassis manual automaend tic transNo. transmission mission
024 877 115.938 104711 123.020 115.939 012 168 000 637
123.000 123.023 115.954 134370 069 490 123.043
123.083
Spare parts
Designation Previous Present part No. part
Intermediate 1150111545 615 011 02 45 flange
Installing and centering
1 Insert intermediate flange into set pins of cylinder crankcase.
2 Slightly tighten the four fastening screws.
3 Screw threaded bolt (self-made) into crankshaft and counterlock with hex. nut.
4 Attach dial gauge holder with dial gauge to threaded bolt.
5 Position feeler pin against OD of round center.
Shown on engine 116
6 Turn crankshaft with tool combination and measure vertical runout. Vertical runout should not exceed max. 0.10.
Note: When turning crankshaft, make sure that feeler pin of dial gauge is not getting stuck.
R 100/6498,
7 Correct vertical runout by means of light blows against intermediate flange.
8 Tighten fastening screws.
Note: If the vertical runout is higher than 0.10 mm, remove intermediate flange.
9 Drill both fitted bores in intermediate flange to 12.1 mm
10 Repeat item 1—8.