Knocking-out and inserting steel balls for main oil ducts

WIS 01-130

Tightening torques Nm

Fastening bolts for intermediate flange65
Closing plug for main oil duct40
Pressure relief valve in main oil duct front valve Closing plug pressure relief40 50
Screw M 8 x 65 for vibration damper35
Screw M 18 x 1.5 x 45 on crankshaft400–450
Necked-down screw for driven plate and flywheelinitial torque torque angle40 90°_190°

Note

Knocking-out and inserting steel balls for main oil ducts – rysunek

Since October 1976 the 2 main oil ducts (arrows) in cylinder crankcase at transmission end are closed by means of steel balls 15 mm dia. VO DIN 5401 part no. 005401 515001.

Knocking-out and inserting steel balls for main oil ducts – rysunek

For cleaning main oil ducts during engine repairs, the steel balls must be knocked-out from direction of front end of engine.

Undamaged steel balls can be used several times without refinishing ball seat in crankcase.

Damaged and rusty steel balls should be replaced.

Knocking-out and inserting steel balls for main oil ducts – rysunek

Knocking-out steel ball in upper main oil duct

1 Remove transmission.

Knocking-out and inserting steel balls for main oil ducts – rysunek

2 Remove flywheel (03—410).

3 Remove radiator (20—420).

Knocking-out and inserting steel balls for main oil ducts – rysunek

4 Remove vibration damper (03-340).

5 Unscrew closing plug (1) and screw oil pressure relief valve out of main oil duct.

6 Knock-out steel ball from direction of engine front end by means of a round steel bar 13 mm dia. and approx. 700 mm long.

Knocking-out steel ball in lower main oil duct

Knocking-out and inserting steel balls for main oil ducts – rysunek

1 Remove transmission.

2 Remove flywheel (03-410).

Knocking-out and inserting steel balls for main oil ducts – rysunek

3 Remove radiator (20—420).

4 Remove vibration damper and compensating weight (03-340).

Knocking-out and inserting steel balls for main oil ducts – rysunek

5 Remove complete oi! pan (01-310).

6 Remove oil pump (18—210).

Knocking-out and inserting steel balls for main oil ducts – rysunek

7 Remove slide rail (2b) in crankcase (05—340).

8 Knock-out steel ball from direction of engine front end by means of a round steel bar 13 mm dia. and approx. 700 mm long.

Closing main oil duct

Knocking-out and inserting steel balls for main oil ducts – rysunek

1 Thoroughly clean ball seat and bore in main oil duct.

2 Coat up on self-made knocking-in mandrel with grease and place steel ball into cup.

Knocking-out and inserting steel balls for main oil ducts – rysunek

103–13 405

Material: C 45

Knocking-out and inserting steel balls for main oil ducts – rysunek

3 Position steel ball with knocking-in mandrel and knock-in up to stop on mandrel.

Knocking-out and inserting steel balls for main oil ducts – rysunek

If the mandrel has no stop, do not exceed dimension a = max. 3 mm to prevent cracking of crankcase.

a= max. 3mm b= dia, 14.75 to 14.86 mm c = oil ducts to crankshaft bearing

4 Mount all parts taken off or removed.

5 Run engine warm and check for leaks.

Note: If oil flows out as the result of a leaking ball seat, knock-out respective steel bal! and close main oil duct with a closing plug after cutting the required threads into duct.

Closing main oil duct with closing plug

Knocking-out and inserting steel balls for main oil ducts – rysunek

1 Cut threads M 16 x 1.5 mm approx. 14 mm deep into respective main oil duct.

2 Carefully clean main oil duct.

3 Screw closing plug M 16 x 1.5 mm DIN 908, part no. 000 908 016 001 with aluminum sealing ring A 16 x 22 mm DIN 7603 — AL, part no. 007 603 016 102, and tighten to 40 Nm.