Removal and installation of catalyst (model year 1977)

Model year 1977/78/79

Removal and installation of catalyst – rysunek

A. Federal version

Removal

Removal and installation of catalyst – rysunek

1 Loosen nuts of flange connections on exhaust manifold and unscrew.

2 Remove heat shields.

14.2–200/1_ USA 1977/78/79 F2

Removal and installation of catalyst – rysunek

3 Remove lateral support on transmission suspension.

Removal and installation of catalyst – rysunek

4 Remove rubber damper between catalyst and center muffler. Disconnect rubber rings on resonance damper and remove exhaust system in downward direction.

Removal and installation of catalyst – rysunek

5 Loosen clamps of underfloor catalyst plug connections. Heat plug connections with a blow torch and remove underfloor catalyst.

gr

14,.2–200/2 USA 1977/78/79 F2

Removal and installation of catalyst – rysunek

Installation

6 Plug catalyst into exhaust system (renew self-locking hex nuts of clamps, as well as those of flange connections). Slightly tighten plug connections.

Install exhaust system and align.

For further installation proceed vice versa. Tightening torque of self-locking hex nuts (6) is 20 Nm (2 kpm).

Removal and installation of catalyst – rysunek

B. California version

Removal

1 Loosen nuts of flange connections on exhaust manifold and screw off.

14,2–200/3 USA 1977/78/79 F2

Removal and installation of catalyst – rysunek
Removal and installation of catalyst – rysunek

2 Remove heat shields.

Removal and installation of catalyst – rysunek

3 Unscrew air injection lines behind small catalysts.

4 Disconnet lateral support on transmission suspension.

Removal and installation of catalyst – rysunek

5 Remove rubber damper between catalyst and center muffler. Disconnect rubber rings on resonance damper and remove exhaust system in downward direction.

Removal and installation of catalyst – rysunek

6 Loosen clamps of underfloor catalyst plug connections. Heat plug connections with a blow torch and remove front catalysts as well as underfloor catalyst.

Installation

7 Plug catalysts into exhaust ing hex nuts of clamps, as well as nections). Slightly tighten plug

Install exhaust system and align.

Removal and installation of catalyst – rysunek

For further installation proceed vice versa. Tightening torque of self-locking hex nuts (6) is 20 Nm (2 kpm).

Exhaust manifold NOShWN— Exhaust pipe Flange Cone connection Self-locking hex nut Hex screw

14.2–200/5 USA 1977/78/79 F2