Subsequent installation of choke cover-stepped heater

WIS 07.2-147

@s) 1974 Federal

Testing and adjusting values

Voltage at pre-resistor output above + 17 °C engine oil temperatureapprox. 12 volts
below + 17 °C engine oil temperatureapprox. 5 volts

Conventional tool

Voltmeter

Note

Subsequent installation of choke cover-stepped heater – rysunek

In the event of complaints about poor engine output a choke cover-stepped heater can be installed in warming-up stage between — 5 °C to +5 °C of Gsa) 1974 Federal version as a remedy.

Installation

1 Attach pre-resistor (1) to auxiliary mounting bracket (2). Connect long cable of auxiliary cable harness at top to pre-resistor.

2 Attach auxiliary mounting bracket (2) to relay bracket.

3 Attach both relays (3) to auxiliary bracket (2). Attach plug of auxiliary harness to relay. Then install auxiliary harness in downward direction along main harness toward fuse box.

Subsequent installation of choke cover-stepped heater – rysunek

4 Attach grounding cable of auxiliary harness to ignition coil bracket. Disconnect connecting plug for engine oil temperature switch 17 °C laterally on front end carrier and connect to auxiliary harness. Engage connecting plug in clip.

5 Connect auxiliary harness with fuse no. 3 of fuse box.

6 Remove air filter and check whether a choke cover with code number ‘’104” is installed and install, if required.

7 Pull cable from choke cover and disconnect cable terminal. Then insulate end of cable and slip plug of auxiliary line harness on choke cover.

8 Check choke cover-stepped heater for function (07.2—145).

Flat rate (includes choke cover, exchange):

Basic job: 20 work units or 1.7 hours Connected job: 17 work units or 1.4 hours

Spare parts

Quantity Designation Part no.

2 Relay 001 542 02 19

1 Auxiliary bracket 114 542 14 40

1 Auxiliary line harness 114 540 47 09

1 Choke cover ‘’144” 000 071 28 28

1 Pre-resistor 001 545 11 18