Subsequent installation of choke cover-stepped heater
WIS 07.2-147
@s) 1974 Federal
Testing and adjusting values
| Voltage at pre-resistor output above + 17 °C engine oil temperature | approx. 12 volts |
| below + 17 °C engine oil temperature | approx. 5 volts |
Conventional tool
Voltmeter
Note
In the event of complaints about poor engine output a choke cover-stepped heater can be installed in warming-up stage between — 5 °C to +5 °C of Gsa) 1974 Federal version as a remedy.
Installation
1 Attach pre-resistor (1) to auxiliary mounting bracket (2). Connect long cable of auxiliary cable harness at top to pre-resistor.
2 Attach auxiliary mounting bracket (2) to relay bracket.
3 Attach both relays (3) to auxiliary bracket (2). Attach plug of auxiliary harness to relay. Then install auxiliary harness in downward direction along main harness toward fuse box.
4 Attach grounding cable of auxiliary harness to ignition coil bracket. Disconnect connecting plug for engine oil temperature switch 17 °C laterally on front end carrier and connect to auxiliary harness. Engage connecting plug in clip.
5 Connect auxiliary harness with fuse no. 3 of fuse box.
6 Remove air filter and check whether a choke cover with code number ‘’104” is installed and install, if required.
7 Pull cable from choke cover and disconnect cable terminal. Then insulate end of cable and slip plug of auxiliary line harness on choke cover.
8 Check choke cover-stepped heater for function (07.2—145).
Flat rate (includes choke cover, exchange):
Basic job: 20 work units or 1.7 hours Connected job: 17 work units or 1.4 hours
Spare parts
Quantity Designation Part no.
2 Relay 001 542 02 19
1 Auxiliary bracket 114 542 14 40
1 Auxiliary line harness 114 540 47 09
1 Choke cover ‘’144” 000 071 28 28
1 Pre-resistor 001 545 11 18