Removing and Installing Charge Air Pipe
WIS 14-1310
Preceding work: Operation no. of operation texts and work units or standard texts and flat rates: 14-1310
Pressure line (transparent) on charge air pipe … disconnect, connect, slacken hose clamp. Connector on pressure switch (S66) ………. disconnect, connect. Pressure switch (S66) 2.0.0.0… 2 eee ee remove, install, renew seal (138c). Bracket (127) 2… ee ce ee ene remove, install. Screw-and-washer assemblies (108) ……… 10 or 12 off, remove, install, torque 25 Nm. Charge air connecting line (138a) ………… remove, put on, renew seal (138b). Charge air pipe (1398) 2… 2. eee remove, attach, renew gasket (106).
ution =A 14.1074~1310/1
Engines 602.962, 603.960/963/971 Gasket of boost air pipe to cylinder head made of improved material.
Production breakpoint: as of October 1993
Engine Engine end no. Engine end no. Model Manual transmission Automatic transmission
124.128/188 602.962 000000 019170
603.960 049519 124.133/193
124.333/393 603.963 004191
140.134 603.971 007455
otis = RA 14.1074-1310/2


