Removal and installation of guiding rails

WIS 05-341

Preceding work: Operation no. of operation texts and work units Poly-V belt removed (13-345). of standard texts and flat rates Chain tensioner removed (05-310).

A. Removal and installation of guiding rail in cylinder head

Removal and installation of guiding rails – rysunek

Turbo engines

Boost air pipe ……….–…000…000-. remove, install.

Engine 601 in model 202

Air cleaner cross pipe remove, install. Cylinder head cover (125) remove, install, bolt (132) 10 Nm.

With self-levelling suspension:

Pressure oil pump drive remove, install (05-437). Camshaft timing gear (188) ……………. mark at timing chain. Remove, install camshaft timing gear. Different bolts (190) and washers (189) with different tightening torques. Hexagon bolt 65 Nm. 12-point bolt 25 Nm/90° (05-220) (Numbers 3 – 5).

Special tools 116 589 20 33 00 and 116 589 01 34 00. Check guiding rail (220), replace if necessary. (Number 6).

LN The extractor 115 589 20 33 00 can be used together with stud 115 589 01 34 00 if the bearing pins have seized.

Tightening torques and tightening angle Nm

Hexagon bolts on cylinder head cover10
Hexagon bolt on camshaft timing gear65
12-point bolt on camshaft timing gear25 90°

Special tools

Removal and installation of guiding rails – rysunek
Removal and installation of guiding rails – rysunek

co oo

2 sop

116 589 20 33 00 “115 589 01 34.00 K JO’ K Jo Jo’ – 001 589 66 21 00

1 Remove cylinder head cover.

With self-levelling suspension:

Removal and installation of guiding rails – rysunek

2 Remove pressure oil pump drive (05-437).

Removal and installation of guiding rails – rysunek

3. Mark relative positions of timing chain and camshaft timing gear.

4 Unscrew hexagon bolt or 12-point bolt on camshaft timing gear, holding camshaft with a mandrel.

5 Remove camshaft timing gear and allow timing chain to sag.

Removal and installation of guiding rails – rysunek

LN Note different bolt and washer (05-220).

6 Drive out both bearing bolts with the impact puller 116 589 20 33 00, and 116 589 01 34 00 and remove guiding rail. Check guiding rail and replace if necessary.

LN Seized bearing bolts can also be pulled out with puller 115 589 20 33 00 and stud 115 589 01 34 00.

Removal and installation of guiding rails – rysunek

7 Coat bearing pin collar with sealing compound.

Removal and installation of guiding rails – rysunek

8 Insert guiding rail and drive home bearing pin with impact puller 116 589 20 33 00 and 116 589 01 34 00.

9 Install camshaft timing gear according to the marking and tighten, noting the color markings.

Removal and installation of guiding rails – rysunek

Tightening torque and tightening angle Hexagon bolt 65 Nm, 12-point bolt 25 Nm, 90°.

10 Position engine on ignition TDC of No. 1 cylinder and check marking (arrows).

AN Do not crank engine by camshaft timing gear bolt.

With selfievelling suspension:

11 Install pressure oi! pump drive (05-437).

12 Install cylinder head cover, 10 Nm.

Timing case cover removed (01-210). Chain tensioner removed (05-310).

B. Removal and Installation of guiding rail in timing case

Removal and installation of guiding rails – rysunek

Guiding rail (218) …………….020–00. pull off from guiding rail bolt (222), put on. Check guiding rail, replace if necessary.

Note Since 09/86 unhardened straight pins have been fitted for the guiding rail bearing.