G17 Btoo.00-x-10002 Technical modifications 22.6.99

WIS misc-comb2.techmod

# G17 BT00.00-X-1000Z

G17 Btoo.00-x-10002Technical modifications22.6.99
BT47.10-P-0001-01ALever sender replaces immersed pipe senderH17
BT47.20-P-0001-01AScrew spindle pump replaces double fuel pump unitJ17
BT47.30-P-0001-01AActivated charcoal filter enlargedModel 140 GsN17
BT49.10-P-0001-01ACatalytic converter coating modified017
BT 14.10-P-0001-01BExhaust manifold modifiedModel 140 RHSP17

<< # G17 BT00.00-X-1000Z 2

H17BT47.10-P-0001-018 —« Lever sender replaces immersed pipesenderhe BT
Standard production breakpoints/Modifications/New featureson breakpoints/Modifications/New features
World manuf. codeModelLHS RHSProd. plantVeh.ident endno. as ofVeh.ident end no. up toProd. period as of_ Prod. period up toNature and reason for modificationReference/Remarks
1401.4.95
1291.10.95
G17 Btoo.00-x-10002 Technical modifications 22.6.99 – rysunek

A lever sender is installed in place of the immersed pipe sender.

Modifications:

e@ _—_ fastened with a bayonet catch

e pressure sensor (arrow) for purging the activated charcoal canister (USA only)

P47.10-0286–01

# G17 BT00.00-X-1000Z

he BT

G17 Btoo.00-x-10002 Technical modifications 22.6.99 – rysunek

J17 Screw spindle pump replaces double fuel BT47.20-P-0001-01A pump unit

Standard production

G17 Btoo.00-x-10002 Technical modifications 22.6.99 – rysunek

Prod. Nature and reason for modification Reference/Remarks World LHS period manuf. RHS_ code up to

<= # G17 BT00.00-X-1000Z

Standard production breakpoints/Modifications/New featureson breakpoints/Modifications/New features
World manuf. codeLHS RHSProd. plantProd. period as ofProd. period up toNature and reason for modificationReference/Remarks
1.8.94
1.8.94
B1.2.95
B1.295
B1.2.95
B1.2.95
1.8.94
1.8.94
1.8.94
1.8.94
B1.2.95
B1.2.95
B1.2.95
B1.2.95
“|1.8.94
B1.2.95
1.8.94
1.2.95
1.10.94
1.10.94
G17 Btoo.00-x-10002 Technical modifications 22.6.99 – rysunek
G17 Btoo.00-x-10002 Technical modifications 22.6.99 – rysunek

1.10.94

#G17 BT00.00-X-10002 a

Standard production breakpoints/Modifications/New featureson breakpoints/Modifications/New features
World manuf. codeMode!LHS RHS_Prod. plantVeh. ident end no. as ofVeh. ident end no. up toProd. period as ofProd. period up toNature and reason for modificationReference/Remarks
129.0761.10.94
140.0281.9.94
140.0321.9.94
140.0331.9.94
140.0421.9.94
140.0431.9.94
140.0501.9.94
140.0511.9.94
140.0631.9.94
140.0701.9.94
140.0561.9.94
140.0571.9.94
140.0761.9.94
202.0281.11.94
202.0181.11.94
202.0201.11.94
202.0221.11.94
202.0231.11.94
202.0241.11.94
202.0251.11.94

202.078 1.11.94

—_ # G17 BT00.00-X-1000Z

Standard production breakpoints/Modifications/New featureson breakpoints/Modifications/New features
World manuf. codeModelLHS RHSProd. plantVeh.ident endno. as ofVeh.ident end no. up toProd. period as ofProd. period up toNature and reason for modificationReference/Remarks
202.0801.11.94
202.0831.11.94

The previous double fuel pump set has been replaced as a phased- Li] Use the hose clips listed in the parts microfiche for attaching in measure by a Pierburg fuel pump (screw spindle pump). the fuel hoses.

Modifications:

e ‘Fuel pump (screw spindle pump)

e Steel fuel pipe from fuel pump to fuel filter replaced by fuel hose. Installed with hose clips

e Fuel feed pipe no longer bolted on, but inserted and

installed with hose clip

<= # G17 BT00.00-X-1000Z 7

N17BT47.20-P-0001-018Activated charcoal filter enlargedModel 140he BT
Standard production breakpoints/Modifications/New featureson breakpoints/Modifications/New features
World manuf. codeModelLHS RHSProd. plantVeh.ident endno.as ofVeh.ident endno.up toProductio nperiod as ofProductio nperiod up toNature and reason for modificationReference/Remarks
140.01.3.94
G17 Btoo.00-x-10002 Technical modifications 22.6.99 – rysunek

Modified (less permeable) fuel system (phased-in as of 03/94). As a result fewer fuel vapors pass to atmosphere.

Modifications:

e = Activated charcoal filter enlarged from 1.15 liters to 3.5 liters e Diameter and material of connection hoses e@ Vent valve (15 mbar) opens at a pressure of 10–20 mbar in fuel tank e Air admission at activated charcoal replaced by air admission flap (A) e O-rings for fuel gauge sender and fuel strainer

A Aijr admission flap B to vent valve P47.30-0257–01 C to purge control valve

# G17 BT00.00-X10002 Cal

he” BT

017 BT49,10-P-0001-014 Catalytic converter coating modified

Standard production breakpoints/Modifications/New features

World manuf. codeModelLHS RHSProd. plantVeh. ident end no. as ofVeh. ident end no. up toProd. period asotProd. period up toNature and reason for modificationReference/Remarks
124.03488683901.11.92
124.03688597101.12.92
140.0410982401.10.92
140.0510982401.10.92
140.07010982401.10.92

Since the production breakpoint the monolith has been coated with germanium.

<= # G17 BT00.00-X-1000Z 9

P17BT14.10-P-0001-01BExhaust manifold modified–Model 140 RHShs BT
Standard production breakpoints/Modifications/New featuresoduction breakpoints/Modifications/New features
World manuf. codeModelLHS RHSProd. period as ofProd. period up to–Nature and reason for modificationReference/Remarks
140.042201.08.91
140.043201.08.91
140.050201.08.91
140.051201.08.91
140.063201.08.91
140.070201.08.91
Since about 08/91 the exhaust manifolds have been modified at the flange position.joified atthe flange position. || gg a 9g
The piping of the exhaust system in theRee FF FC Ca hUCUhhrhlUrhUC POC DSEClUCCrOTUUmcETLUlUCUrUCUlUCLlhlhLh hUCUrhlhlcC iC rR CLO CUrrlCUremmErlUlUcarUCrrcUCmCr LC Uc UCT LC UCUCr ‘TC KC Or fj ese _-_, ==. Oo
G17 Btoo.00-x-10002 Technical modifications 22.6.99 – rysunek
G17 Btoo.00-x-10002 Technical modifications 22.6.99 – rysunek
G17 Btoo.00-x-10002 Technical modifications 22.6.99 – rysunek

engine compartment has been matched to the modified exhaust manifold.

P14.10-0211–01 P14.10-0214–01