Removing and Installing tensioning device
WIS 13-3450
Preceding work: Operation no. of operation texts and work units or standard texts Poly V-belt removed (13-3420). and flat rates 13–1202-4001
1st version
Tensioning device 0… 0… ee eee eee ee remove, install (100 Nr) (steps 1 to 3).
Tightening torques im um Fastening bolt of tensioning device 100 Bolt of tensioning pulley to bracket (M8 x 40) 30
wie RA 13.1322-3450/1
Removing, installing
Remove poly V-belt (1 33420). N
Unscrew bolt (16). 2 t 4 Tightening torque 100 Nm.
ww SS oe a a 2 2 = @
Installation instruction The setting pointer must be aligned with that of the first marking (1) in the untensioned condition.
3 R move tensioning nut (1 ) together with 2 ¢ Le 4 tensioning bolt (8) frorn bracket (10) at the power steering pump.
Installation is performed in the reverse order.
ngine 149.960
captain
RA 13.1322-3450/2
2nd and 3rd version
A 2nd version 1 M8 x30 hexagon socket bolt washer B 3rd version 12 M& x30 hexagon socket bolt + washer
End cover (6) 2.2… cc eee eae see ewe take off, fit on. and version: bolt (5) 2… 0. ee ee ee es unscrew, screw on (25 Nm). 3rd version: nut (5a) ….. sence ewe veeeeee unscrew, Screw on (25 Nm). Tensioning pulley (8) ……….. eee seeeee remove, install. Bolts (11) and (12) ……………..00+54 uNSCreW, Screw on (21 Nm). Tensioning device (1} with sleeve (2) 2. – remove, install.
mihin RA 13.1322-3450/3
whim RA 13.1322-3450/4






