Checking injection valves

WIS 07.3-135

Checking injection valves – rysunek
Checking injection valves – rysunek

Preceding operation: Removal, reinstallation of injection valves (07.3-215)

P07-028055

Injection valves (92) «1… kee eee check. Rough leak test 2… ee eee eee a) Connect removed injection valves to tester. Bleed pressure line with opened shut-off valve and opened union nut. Then tighten union nut.

b) Shut-off valve open, slowly actuate hand lever (4 s/stroke) and build up pressure to a maximum of 1.5 bar pressure. If a leak is detected on the injection valve, the injection valve must be renewed.

On used injection valves, at least 3.7 bar pressure. Close shut-off valve. Flush injection valve by rapidly actuating the hand lever several times. Open the shut-off valve and check opening pressure with slow movement of the hand lever. close shut-off valve. Flush injection valve by Fine leak test rapidly actuating the hand lever several times, open shut-off valve and slowly build up pressure to 0.5 bar below the previously established opening pressure and hold. No drop must form on the injection valve within 15 seconds. close shut-off valve and flush injection valve by Buzzing test, evaluation of spray pattern actuating the hand lever several times (0.5 s/stroke). Then reduce lever speed to approx. 1 s/stroke. When doing so the valve must emit a buzzing sound. No drops must form on the valve mouth. A concentrated stream is not permissible. One sided, atomized spray pattern within an overall spraying angle of approx. 35° is permissible. Spray pattern evaluation see figures.

Test values

Opening pressure of injection valves’)with new injection valves4.3–4.6 bar pressure
with used injection valvesat least 3.7 bar pressure
1) Tightening torquesRenew injection valves which are outside the tolerance. The injection valves can be individually changed within a set.
Injection lines to fuel distributor (reference value)reference value) – 10–12
Injection lines to injection valves (reference value)(reference value) Oo 10–15 oe

Nozzle tester EFEP 60 H’) Bosch No. 0 684 200 700 Bosch No. 1 687 231 000 Pressure gauge 0–6 bar pressure housing dia. 100 mm Quality class 1.0 Piping a Bosch No. 1 680 750 001 Adapter 2) Bosch No. KDJE-P 400/7 Corresponds to the previous nozzle tester. The listed pressure gauge or the pressure gauge of the pressure measuring device 100 589 13 21 00 is necessary to test the injection valves. 2) An adapter is required due to the changed connection thread M10 x 1 of the injection valves.

Note

Checking injection valves – rysunek

The nozzle or valve tester is used to check the opening pressure, the buzzing, the jet and the tightness of the injection valves.

Checking injection valves – rysunek

Before starting the injection valve test, the tank of the tester must be filled and the device bled. Only petroleum must be used for testing.

Checking injection valves – rysunek

Spray pattern evaluation

Faulty injection valves

Checking injection valves – rysunek

Drop formation

Checking injection valves – rysunek

Stream

Checking injection valves – rysunek

Spreading spray pattern

Good injection valves

Good spray pattern

Checking injection valves – rysunek

Slightly one-sided atomization