Removal and installation of injection valves

WIS 07.3-215

Tightening torques (reference values) Nm

Injection lines to fuel distributor10–12
Injection lines to injection valves10–15

Removal

1 Remove air filter.

2 Unscrew injection lines on injection valves and on fuel distributor. Apply counterhold to injection valves when loosening injection lines.

Attention! When unscrewing injection line of cylinder 2, avoid kinks in Tecalan line (if installed), unscrew Tecalan line, if required.

Removal and installation of injection valves – rysunek

3 Unscrew fuel line for cold-starting valve.

4 Loosen fastening screws and remove fastening bridges. When loosening 8th injection valve, unscrew bearing bracket for longitudinal regulating shaft, if required.

Attention! When removing fastening bridges, apply counterhold to injection valves, so that the injection valves and the insulating sleeves are not following along.

Removal and installation of injection valves – rysunek

5 Pull out injection valves. While applying counterhold to insulating sleeve (2). If the insulating sleeves are pulled out, install new O-rings (1).

Installation

Removal and installation of injection valves – rysunek

6 Install injection valves in vice versa sequence. For this purpose, displace or renew rubber sealing rings (3).

Note: Mount pulled out insulating sleeves with new O-rings.

7 Connect injection lines and fuel line for coldstarting valve while paying attention to tightening torques as reference values.

Attention!

Removal and installation of injection valves – rysunek

Apply counterhold to injection valves when tightening injection lines.

8 Keep engine running and check all fuel connections for leaks.