Checking injection valves
WIS 07.3-135
Test data
Injection valves Bosch no. 0 437 502 010
with new injection valves 3.5–4.1 bar gauge pressure Opening pressure with used injection valves min. 3.0 bar gauge pressure
Tightening torques Nm
| Injection lines to fuel distributor (reference value) | 10–12 |
| Injection lines to injection valves (reference value) | 10–15 |
Conventional tools
Bosch order designation Valve tester Bosch KD-JE 7452 KD-JE 7452 JE 74
Nozzle tester EFEP 60 H’) Bosch no. 0 684 200 700
Pressure gauge O—6 bar gauge pressure Bosch no. 1 687 231 00 Quality class 1.0 housing dia. = 100 mm
Pipe line Bosch no. 1 680 750 001
1) Corresponds to nozzle testers used up to now. To check injection valves, the pressure gauge named above or the pressure gauge of pressure measuring device 100 589 13 21 00 will be required.
Note
The nozzle or valve tester serves to check the opening pressure, the buzzing test and the fuel jet, and also for checking the injection valves for leaks.
Prior to checking injection valves, fill container of tester and bleed. For testing, use kerosene only.
Injection valves, beyond tolerance must be renewed. Injection valves can be individually interchanged within one set.
For checking, remove injection valves (07.3–215).
1 Coarse leak test:
a) Connect removed injection valves to tester. Bleed pressure line with shutoff valve open and coupling nut released by actuating lever slowly several times. Then tighten coupling nut.
b) With shutoff valve open, slowly actuate hand lever (4 s/stroke) and build up pressure up to max. 1.5 bar gauge pressure. If injection valve shows a leak, replace.
2 Check opening pressure.
Close shutoff valve. Operate hand lever quickly several times to flush injection valve.
Open shutoff valve and check opening pressure while moving lever slowly.
3 Fine leak test:
Close shutoff valve. Operate hand lever fast several times to flush injection valve, open shutoff valve and increase pressure slowly up to 0.5 bar gauge pressure at previously determined opening pressure and hold. No drops should show up at injection valve within 15 seconds.
4 Buzzing test, evaluation of jet:
Close shutoff valve and flush valve by operating lever several times (0.5 s/stroke). Then reduce lever speed to approx. 1 s/stroke. Valve should then buzz. No drops should show up at valve mouth. There should be no cord-type jet. One-sided, atomized jet formations within a total spray angle of approx. 35° is permitted.
Damaged injection valves
Formation of drops
Cord-type jet
Poorly proportioned jet
Good injection valves
Well proportioned jet
Mitts
Slightly one-sided atomization