Removal and installation of carburetor
WIS 07.2-194
Nm
Tightening torques
Fastening screws for rubber flange 15
30 Fastening screws for adapter on carburetor
Fastening screws for carburetor 50
Special tool
Clamp
Conventional tool
e.g. made by Stahlwille, D—5600 Wuppertal Torque wrench single-arm, 15–65 Nm Order No. 73/6
Removal
1 Remove rubber sleeve (1) and crankcase breather pipe (2), also pull off electric plug connection (3) for heating choke cover. On model! 123, pull off hose for idle speed bypass mixture on carburetor.
2 Remove fuel feed and return hose, as well as vacuum lines.
1 Fuel feed hose to carburetor 2 Fuel return hose to fuel tank
3 Evacuate excess pressure in cooling system by loosening radiator cap for a short moment.
4 Pinch coolant hoses for heating choke and carburetor with a clamp and remove.
1 Coolant hoses for heating carburetor
5 Disconnect regulating rod (arrow) on throttle valve lever of carburetor.
6 Loosen grounding cable of carburetor and carburetor fastening screws and remove carburetor.
7 Remove rubber flange (4), insulating flange (5), gasket (6) and shielding plate (7) and check. Replace damaged parts.
Standard version and up to 1974 Carburetor fastening = screw Gasket Onan WH Fastening screw for rubber flange Rubber flange Insulating flange Gasket Shielding plate Intake pipe
Installation
8 For installation proceed vice versa, pay attention to the following:
9 Use new gaskets. Connect vacuum lines on carburetor correctly.
Insulating flange layout
Gs 1975/76
1 Carburetor fastening screw DWYAMA WH Gasket Fastening screw for rubber flange Rubber flange Insulating flange Gasket Shielding plate Intake pipe
1977/78 1 2D ror fastening screw Gasket ANOS WN Fastening screw for rubber flange Rubber flange Insulating flange Gasket Shielding plate Intake pipe
Vacuum connections
ws © 117 Float chamber vent (@us)onty) 118 Draw-off connection for fuel evaporation control system (@us)only) 161 Float chamber vent valve A_ Intake air preheater (blue ring) B_ Ignition (red ring) C Vacuum governor Arrow= connection pulldown (starting 1978)
@sd) 1973
1 Diaphragm rod (pulldown) A Vacuum connection EGR (brown) B_ Vacuum connection ignition timing “retard” (white) C Vacuum connection for switchover valves (blue)
Gs) 1974 A Vacuum connection EGR (brown) B Vacuum connection closed C Vacuum connection for switchover valves (blue)
Gs 1975/76 Draw-off connection for fuel evaporation control 118 Vacuum connection closed A Vacuum connection for switchover valves B R Vacuum connection for EGR
G@) Gs) starting 1977 117 Float chamber vent 118 Draw-off connection for fuel evaporation control 161 Float chamber vent valve A Intake air preheater (blue ring) B_ Ignition (red ring) Arrow = connection pulldown (starting 1978)
11 Plug on fuel hoses according to arrow marks on carburetor housing.
Replace defective coolant hoses for heating choke and carburetor.
1 Fuel feed hose to carburetor 2 Fuel return hose to fuel tank
12 Check fastening screws (125) for adapter for specified tightening torque.
Attention! When renewing gasket (127), make sure that the vent bore (arrow) is not covered by gasket, since otherwise in spite of a perfect idle speed exhaust gas value the full load exhaust gas value is considerably above permissible tolerance (high fuel consumption).
13 Adjust idle speed (07.2–100), adjust choke (07.2–125).















