Survey mixture preparation

WIS 07.3-199

Survey mixture preparation – rysunek
Survey mixture preparation – rysunek

OBNINDOSWN= Cold starting valve Fuel distributor Injection lines Plastic clip Plastic clip Fuel line Nut Corrugated washer Fastening bridge

10 Injection valve 11. Rubber ring

12 Plastic sleeve 13. O-ring

14 Air guide housing

15 Hose clamp

16 Rubber sleeve 17. Hose clamp

18 Polystop nut

19 Safety switch

20 Screw 21 + Throttle valve housing

22 Closing plug

23 Closing plug 23a Adjusting device

24 O-ring 25 = Air flow sensor

26 O-ring 27 + ~=Regulator piston

28 Compression spring

29 Adjusting washers

30 O-ring 31. Copper sealing ring

32 Closing plug

Survey mixture preparation – rysunek

Control pressure line Warm-up compensator prior to WN 11a Connection leak line Fuel distributor September 1981 1st version Control pressure line with Tecalan Vacuum connection for full load Distributor 12 1st version enrichment 13 Connecting hose Connection to leak line (atmosphere) Control pressure line with Tecalan w 14 Screw ® 2nd version, starting with increased output 15 Corrugated washer -SCOUNDNDVAIOUNS Warm-up compensator Warm-up compensator starting 16 Leak line Vacuum hose for full load enrichment September 1981 18 Screw Vacuum connection for full load Hose clamp 19 Corrugated washer Hose clamp for emission version only 20 Gasket enrichment o Connection to leak line (atmosphere) Fuel return line 21 Flange Hose clamp 22 Closing plug Fastening holder Contour hose Connection for ignition retard Thermo time switch o Sealing ring any Auxiliary air valve Pressure damper Contour hose