Replacing timing chain
WIS 05-320
Valve clearance Cold engine (approx. 20°C) (68°F) Warm engine (60 °C + 15 °C) (140 °F +59 °F)
Intake 0.10!) 0.15!)
Exhaust 0.25 0.30
1) 0.05 mm more for consistent outside temperatures below —20 °C (—4.0 °F).
Tightening torques Nm
Cylinder head cover bolts and capped nuts 5
Chain tensioner ball locating ring 25
Valve adjusting screw 20–40
Special tools
Depressor for valve springs ce )\¥ GU de Y a – 110 589 04 61 00
27 mm wrench socket, 1/2’ square, “a to turn engine mo
0 001 589 65 09 00
Rigid chain tensioner sare – 110 589 03 31 00
a Holder for chain tensioner \ if i? – 110 589 02 31 00
Valve adjusting wrench 17 mm SS De 2 SY IF 1004-7003 – 110 589 01 01 00
Wrench socket 10 mm. secu af 1/2” square, 140 mm long – 000 589 05 07 00
Note
For repairs a repair chain with plug link, part no. 000 997 69 94 is available.
If only an endless timing chain with 130 links is available, chain can be split by grinding into both pins of a link and using a plug link for assembly. (Do not apply pressure, since this would result in lateral deflection). Use only one plug link, part no. 000 997 05 98 with two lock washers.
Check sprockets for scoring and pitting.
Replacing
1 Remove spark plugs and take off cylinder head cover.
2 Remove rocker arm of righthand camshaft (exhaust) (05—230), so that camshaft will not rotate in jerks.
3 Remove chain tensioner (05—310). Install rigid chain tensioner and tighten by hand.
Chain drive
1 Exhaust camshaft sprocket 7 Timing chain 2-2b Sliding rail 8 Camshaft sprocket
3 Intake camshaft sprocket 9 Bearing pin tensioning rail
4 Guide wheel 10 Tensioning rail
5 Lock screw 11 Hydraulic chain tensioner
6 Intermediate gear
4 Cover chain housing with a clean cloth and break timing chain with chain separating device or grind off both chain pins of one link.
5 Connect new timing chain to old timing chain with one link, whereby the broken link is pressed out.
6 Turn crankshaft in engine’s direction of rotation slowly with a 27 mm socket wrench and a ratchet, and at the same time lift the old chain until the link is at the uppermost point of the right camshaft sprocket.
Attention! While turning the timing chain must be in constant engagement on both camshaft sprockets.
7 Detach old timing chain and connect ends of new timing chain with one link. Install center bar (arrow) and outer bar. Press on lock washers.
8 Turn crankshaft and check adjustment marks with engine in TDC position.
9 Disassemble chain tensioner, move to assembly position and install (O5—310).
10 Install rocker arms (05—230).
11. Adjust valve clearance of exhaust camshaft (O5–210).






