Removal and installation of intake pipe
WIS 09-415
Removal
1. Partially drain coolant.
2 Remove air filter.
3 Remove carburetor (07.2—194).
4 Disconnect engine longitudinal regulating shaft and regulating rods.
5 Loosen all connections on intake pipe.
6 Loosen intake pipe fastening nuts or screws and remove intake pipe.
Installation
Install intake pipe in vice versa sequence as follows:
7 Install new intake pipe flange gasket.
8 Add coolant and check cooling system for leaks.
9 Adjust idle speed, while checking intake system for leaks (07.2—100).
