Facing crankcase contact surface

WIS 01-1200

Facing crankcase contact surface – rysunek

Operavon no. of operation texts and work units or standard texts Preceding work: Engine disassembled and flat rates

4 34g! vu 27,

Crankcase engine 103.980 Data
Height ”H” of crankcase when new282.25 — 282.35
Minimum height after necessary stock removal ’)281.95
Permissibletop crankcase contact surface0.03
unevennessbottom crankcase contact surface0.04
Permissible deviation of parallelism of top to bottom crankcase contact surface in longitudinal direction0.1
top crankcase contact surface0.005 — 0.020
Peak-to-valley height (Rz)bottom crankcase contact surface0.025
Test pressure with air under water in bar gauge1.5
Chamfer of cylinder boressee note

1) The stock removal at the crankcase and cylinder head of an engine must together be not more than 0.5 mm (see 01-4180).

ui §=RA 01.1113-1200/1

Note Face crankcase together with timing case cover.

After facing the cylinder bores, chamfer 0,503 according to sketch.

q

SA, 4, LSE WME TELELS VILETTTTTS LLL SILSAL LLL. VOITELLLL SSS, a aed P03-0060–13

Facing crankcase contact surface – rysunek

Chamfer cylinder bores with a suitable handmilling cutter as shown in the sketch. Smooth bottom edge of chamfer with polishing stone.

If the crankcase contact surface is remachined, the timing of the camshaft must be checked (05-2150) and the piston projection checked (03-3160).

emige §=RA 01.1113-1200/2